closeFosters Primary School, Maidstone Kent
Canopy for School to provide covered play area
11000mm x 6075mm with a height so as to overlap the existing roof.
We were contacted by the headteacher at Fosters Primary School to take down their existing canopy and design, manufacture and install a covered play area for their pupils. The existing school canopy was leaking and had posts which were an obstruction to the play area. 123v designed a bracket system so as to solve this problem. They decided to go for the canopy in RAL 3020, a striking red colour. Our inhouse team obtained building regulations for this canopy and we completed the install in half term to avoid disruption to teachers and kids alike. The outcome allowed for a far more usable canopy play area with vastly improved appearence.
School in the South East, with doors leading to the existing play area.
Aluminium Framework with 123v Grp translucent roof sheeting. All framework was powdercoated in RAL 3020
RAL 3020 Red with translucent blue ti9nted roof sheeting.
4 days in Easter Half term