Ask about our Finance Options and payment Plans, or to lean more click here
closeHarpenden, Hertfordshire, UK
Commercial Canopies & Loading Bays
14600mm x 3500mm
The client had a requirement for a loading bay canopy at their commercial warehouse premises in Harpenden, Hertfordshire. The Canopy had to be high enough so the artic lorries could reverse into the loading bay and have the minimum number of posts/columns at the front of the canopy creating a wide span. 123v solved this problem by using our 300mm deep aluminum beam section that we developed for projects like this one. The front posts were set back from the front of the canopy to minimize maneuvering obstacles. The customer did not want the canopy to block out daylight from the premises, The answer to this was our G.R.P. translucent 3.0kg m² roof sheeting which lets through 85% of day light.
Commercial warehouse building with large Loading bay doors
Canopy superstructure - structural grade aluminium-powder coated. Base plates - galvanised and powder coated steel. Roofing material - GRP translucent 123v profile
White with grey cross braces to canopy columns
The canopy was installed in 3 days without interfering with the company’s operations.
Please have a browse through our Canopies Gallery and see some of the possibilities that we could provide for you.